Lanta Software

Use cases

Keep the handoffs around engineering work from losing context.

Custom automation projects move between customer scope, mechanical design, controls, purchasing, assembly, and validation. Lanta keeps the requirements, discussions, decisions, changes, and evidence around those handoffs connected.

Use case 01

Customer scope and requirements

Keep the original request connected to what engineering is expected to deliver.

THE PROBLEM

Customer requests, specifications, quotes, assumptions, and later clarifications can drift apart.

WITH LANTA

Lanta provides a structured requirements workspace where teams can preserve the original source, record obligations and assumptions, track clarification, and reconcile changes without losing traceability.

Requirements registerFictional sample data
PROJECTPC-2407 · Packaging cell
12 requirementsFilter · Open
SELECTED REQUIREMENTREQ-014 · Rear service clearance

Original source preserved from customer specification, page 6.

Related artifact
ASM-440 · REV B.04
Related change
CHG-008
Verification
Design review
Illustrative Lanta requirements workspace · fictional sample data

Use case 02

Collaborative design reviews

Keep feedback grounded in the exact file, component, and revision.

THE PROBLEM

Feedback becomes disconnected from the exact file, component, revision, or decision it referred to.

WITH LANTA

Lanta combines an APS-based design-viewing workspace with findings, discussions, ownership, disposition, and connected engineering records.

Illustrative Lanta APS-based review workspace · fictional sample data

Use case 03

Engineering change coordination

Make every affected discipline and accountable action visible.

THE PROBLEM

A mechanical change can create effects across controls, electrical design, purchasing, fabrication, documentation, and commissioning.

WITH LANTA

Lanta keeps the reason for a change, its affected scope, impact assessments, decisions, and accountable follow-up actions connected.

Engineering changeFictional sample data
CHG-008 · ASSESSMENT OPENRevise guard access and cable route

Origin: FND-002 · Baseline: ASM-440 REV B.04

Decision pending
  1. 01Assessment3 of 4 complete
  2. 02DecisionPending
  3. 03ExecutionNot started
  4. 04OutcomeNot verified
Discipline / ownerImpact statusRequired action
MechanicalM. ChenAffected

Revise panel envelope

ControlsR. DiazNeeds input

Confirm cable route

PurchasingA. SinghAssess

Review released guard PO

ElectricalN. PatelReviewed

No drawing impact · rationale recorded

Illustrative Lanta change workspace · fictional sample data

Use case 04

Validation and readiness

See whether evidence still applies to the machine you are preparing to deliver.

THE PROBLEM

Evidence can become outdated when designs or configurations change, making project readiness difficult to assess.

WITH LANTA

Lanta connects checks and evidence to the applicable configuration so teams can see what is complete, what requires attention, and what may need to be reassessed.

Validation & readinessFictional sample data
FAT READINESS · CURRENT CONFIGURATIONPackaging cell · Baseline R13

Configuration updated by CHG-008

READINESSAttention1 blocker · 1 review
VALIDATION CHECKAPPLICABILITYEVIDENCE / STATUS

Guard interlock functionVAL-018 · Baseline R13

Current configurationFAT-018.pdfComplete

Prior clearance checkVAL-021 · Baseline R12

Reassess after CHG-008Evidence recordedApplicability review

!Rear access inspectionVAL-024 · Baseline R13

Current configurationNo evidence yetOutstanding · Mechanical

Transfer sequenceVAL-026 · Baseline R13

Current configurationRun-026.csvComplete
Illustrative Lanta readiness workspace · fictional sample data

Design partner program

Help shape the engineering workspace your team actually needs.

Lanta is being developed with engineering teams working on complex, customer-specific machinery. Design partners receive early access and help guide the product through practical feedback.

Request a design-partner demo